System Integration

System Integration and software development for validated systems requires an accurate, well-organized, and documented design cycle. Bay-Tec has established detailed programming and testing SOP's which control the software life cycle. Experts in control system design and theory for control and information management, Bay-Tec is a leader in developing scalable automation and information applications for their clients.

A modular development/testing approach affords Bay-Tec Project Managers the ability to maintain schedule status of software during development. By defining logical Functional Control Modules, the software can be divided into manageable functional components for ease in programming and testing.

Bay-Tec's software approach generally follows:

FUNCTION DOCUMENTATION
Define System Requirements
  • Automation Functional Requirements
  • Software Design Description (SDD)
Define Functional Control Modules (FCM)
  • Included in SDD
Program FCM's
  • Document code on-line during development
In-Progress FCM Testing
  • Develop and execute in-progress test procedures which are executed and approved by Software Manager for completeness.
  • Insures FCM accuracy during development cycle
  • Allows for accurate schedule management of software development timeline
Develop/Execute
Complete System Test
  • Factory Acceptance Test (FAT) - utilizing simulation tools insures functionality of entire system as described in SDD prior to leaving Bay-Tec

This documented approach allows Bay-Tec flexibility during the software development cycle without sacrificing quality or confidence in the performance of the system.