Bay-Tec Home
Services & CapabilitiesProject ProfilesAbout Bay-Tec CareersNewsLinksContact Us

 

 

  © 2003 BayTec

Services & Capabilities
  Turn-key automation solutions:
project management | engineering & design | system integration
control panel fabrication | installation & commissioning | calibration
control system validation


CONTROL SYSTEM VALIDATION

Bay-Tec Engineering has been designing, building, and validating automation systems for clients as a component of projects since the early 1980's. This awareness of the validation requirements, and the evolution of the validation industry has positioned Bay-Tec as an extremely valuable member of a project team. The early awareness of validation requirements, documentation, and testing is built into Bay-Tec's internal SOP's.

The control system validation protocols developed and executed by Bay-Tec typically include:

Protocol

Function

Hardware Installation Qualification (HIQ)
  • Verifies all control system hardware is installed and functioning in accordance to design and specifications

Software Installation Qualification (SIQ)
  • Verifies all software files are installed with the proper revision dates.

Operational Qualification (OQ)
  • Verifies compete installed system is operating and functional per design, specification, and performance criteria.